The interior use MK IV and the exterior/interior use MK VII are completely pre-build and delivered to you through our Fast Track Scheduling System. CPS can produce, deliver and place your structure by forklift within two weeks of your Design/Drawing approval. Unlike permanent structures, CPS units mean no construction delays and because the units are pre-wired, they simply connect to existing utilities, ready to do business the same day.
When you take delivery of a Mark IV or Mark VII portable, you’re getting a strong, quality built product that will give you maximum protection inside and out against rain, snow, noise, heat or the hazards of the work environment.